200 kW photovoltaic plant to cover the own needs of the golf course and the hotel part of it. The power plant is built on the roof of a shed and parking structure on a golf course in Ravno Pole.
The documentation for ERM West and the municipality of Elin Pelin was managed by VVT Engineering. The project in all necessary parts and the parking structure was designed, manufactured and built by VVT Engineering EOOD. It is 100 meters long and has a capacity of 34 parking spaces.
The structure is designed so that a car with a height of up to 2.80 m can be parked. The distance between the columns is adjusted for two parking spaces.
The plant consists of 370 Bauer Solar photovoltaic modules with a power of 540W with a 20-year product warranty and 4 ZCS Azzurro 50kW inverters with a 10-year warranty.
The entire construction of the plant took 20 working days. After the construction of the photovoltaic plant, all necessary declarations and quality certificates were issued for the purpose of commissioning.