Photovoltaic plant – Vertex

95kW photovoltaic plant to meet own needs and sell excess energy. The plant was built on the roof areas of a Vertex factory.
Documentation for ERM West and the Metropolitan Municipality and the project in all necessary parts were maintained and prepared by VVT Engineering.
The structure was designed and built by VVT Engineering EOOD. It consists of a Schletter thermal panel roof system. The plant is made up of 120 Bauer Solar photovoltaic modules with a power of 540W with a 20-year product warranty, 1 ZCS Azzurro inverter with a 10-year warranty with a power of 50kW, 1 ZCS Azzurro inverter with a 10-year warranty and a power of 20kW and 1 ZCS hybrid inverter Azzurro with 10 year warranty with 20kW power. It is possible to additionally install a storage system.
The entire construction of the plant took 10 working days. After the construction of the photovoltaic plant, all necessary declarations and quality certificates were issued for the purpose of commissioning.