Petar Mihailov and Co., Photovoltaic plant

We built a 140kW photovoltaic plant for our own needs and the sale of excess electricity, built on the roofs of the warehouses of Petar Mihailov and Co. in Sofia.
The documentation for ERM West and the Slatina region was managed by VVT Engineering. The project in all necessary parts was prepared by VVT Engineering.
The construction is completed with Schletter’s high-quality tightening system.
The plant consists of 258 Bauer Solar photovoltaic modules with a power of 540W with a 20-year product warranty and 1 Kostal Piko CI 50kW inverter, 1 Kostal Piko CI 60kW inverter and 1 Kostal Piko CI 30kW inverter with a 5-year warranty.
The entire construction of the plant took 14 working days. After the construction of the photovoltaic plant, all necessary declarations and quality certificates were issued for the purpose of commissioning.